Trabuco Creek Channel - San Juan Capistrano, CA
Type of Project:
Levee Reinforcement
Equipment Used:
Giken Eco 1400 & Auger Crush
The agency has had successful previous experience with the Giken Silent piler and due to the close proximity of commercial and residential structures it was determined to be the correct equipment for their project. This project required use of the simultaneous Auger Crush due to the cobbles and underground obstructions. The Giken with Auger Crush alleviated damaged piles which would have been sustained during piling in similar conditions with conventional pile driving.
Let's work together
Contact us to learn how BIC can fulfill your engineering project, while ensuring the highest quality results and performance.
BIC The Original
31 N Cluff Avenue
Lodi CA 95240
(916) 441-3538